SPS 345.20 HistoryHistory: CR 03-012: cr. Register October 2003 No. 574, eff. 11-1-03; CR 10-011: (intro.), (2), (3), (5) to (8) renum. from Comm 45.05 (intro.), (1), (2), (4), (7) to (9), r. (3), (5) and (6), cr. (1), (4) and (9) Register August 2010 No. 656, eff. 9-1-10; correction in (4) (a), (5) made under s. 13.92 (4) (b) 6., 7., Stats., Register December 2011 No. 672.
subch. III of ch. SPS 345Subchapter III — Administration and Enforcement
SPS 345.30SPS 345.30Installation registration.
SPS 345.30(1)(1)Classifications. Any installation of the following mechanical refrigeration systems or components thereof shall be registered with the department:
SPS 345.30(1)(a)(a) Any system using a Group A1 or B1 refrigerant and having a capacity rated at or greater than 50 horsepower, 50 tons or 50,000 volt-amperes.
SPS 345.30(1)(b)(b) Any system using a Group A2, B2, A3 or B3 refrigerant and having a capacity rated at or greater than 10 horsepower, 10 tons or 10,000 volt-amperes.
SPS 345.30(1)(c)(c) Any alteration of a mechanical refrigeration system, that causes the system to have or exceed the capacity in par. (a) or (b).
SPS 345.30(1)(d)(d) Any alteration or repair of a currently registered mechanical refrigeration system.
SPS 345.30 NoteNote: See normative appendix C in ANSI/ASHRAE standard 15, as adopted in subchapter IV, for characteristics of the refrigerant safety groups listed in paragraphs (a) and (b). For characteristics of individual refrigerants, such as the safety groups they are assigned to, see Tables 1 and 2 in ANSI/ASHRAE standard 34, as referenced in appendix E of ANSI/ASHRAE standard 15.
SPS 345.30(2)(2)Forms. Registration information shall be submitted on form SBD-34.
SPS 345.30 NoteNote: The Department forms required in this chapter are available for a nominal fee at telephone 800-DOC-SALE or 411 (Telecommunications Relay), or at no charge at the Department’s Web site at www.dsps.wi.gov through links to Division of Industry Services forms.
SPS 345.30(3)(3)Submittal deadline.
SPS 345.30(3)(a)(a) The registration form shall be submitted to the department at least 20 business days before the system is initially placed in operation.
SPS 345.30(3)(b)(b) A registration form shall be submitted to the department at least 20 business days before a system is reactivated after an alteration, repair or replacement.
SPS 345.30 NoteNote: The purpose of the registration is to inform the Department of the pending activation of the refrigeration system and thereby enable performance of the inspection specified in section SPS 345.31 (2). Under that section, this inspection must be performed within 45 business days after completion of construction or installation.
SPS 345.30 HistoryHistory: CR 03-012: cr. Register October 2003 No. 574, eff. 11-1-03; CR 10-011: renum. from Comm 45.07 and am. (1) (intro.), (2) and (3), renum. (4) to be Comm 45.32 (6), cr. (1) (c) and (d) Register August 2010 No. 656, eff. 9-1-10.
SPS 345.31SPS 345.31Enforcement and inspections.
SPS 345.31(1)(1)Enforcement.
SPS 345.31(1)(a)(a) This chapter shall be enforced by the department and its authorized agents.
SPS 345.31 NoteNote: Section 101.02 (15) (g) of the Statutes authorizes the Department and its authorized agents to enter any building, facility or premises and examine any mechanical refrigeration system or component and associated records for the purpose of enforcing this chapter.
SPS 345.31(1)(b)(b) Where an authorized agent administers and enforces this chapter in conjunction with the department, the authorized agent’s administration and enforcement shall be exercised in advance of the department’s administration and enforcement.
SPS 345.31 NoteNote: Under section SPS 345.11 (5), the department reserves the right to interpret the requirements in this chapter and in all adopted codes and standards.
SPS 345.31(2)(2)Installation inspection.
SPS 345.31(2)(a)(a) The authorized agent or the department shall inspect a mechanical refrigeration system that is required to be registered under s. SPS 345.30 (1), within 45 business days after completion of the initial construction or installation, and within 45 business days after completion of construction or installation relating to any alteration, repair or replacement.
SPS 345.31(2)(b)1.1. All refrigerant steel piping that will employ welded joints shall be inspected by the authorized agent or the department after the piping material is delivered to the job site and prior to installation of the piping.
SPS 345.31(2)(b)2.2. The authorized agent or the department shall be given a minimum of 5 business days notice prior to the start of construction to arrange for inspections under this paragraph.
SPS 345.31 NoteNote: The Department can be notified by writing to the Division of Industry Services, Mechanical Refrigeration Program, P.O. Box 7302, Madison, WI 53707-7302; or by telephone at 608/266-7548 or 411 (Telecommunications Relay); or by using the contact information available through the following Web site: http://dsps.wi.gov/Documents/Industry%20Services/Maps/Mechanical-Refrigeration-Gas-Systems-Anhydrous-Ammonia%20Map%2008-13.pdf.
SPS 345.31(2)(b)3.3. If applicable and if required by the authorized agent or the department, the following documents shall be made available for review during inspections under this paragraph:
SPS 345.31(2)(b)3.a.a. Welding procedure specification.
SPS 345.31(2)(b)3.b.b. Procedure qualification record.
SPS 345.31(2)(b)3.c.c. Welder performance qualification.
SPS 345.31(2)(b)3.d.d. Welder continuity record.
SPS 345.31(2)(b)3.e.e. Design calculations.
SPS 345.31(2)(b)3.f.f. Design plans for the piping system.
SPS 345.31(2)(b)3.g.g. Material test reports.
SPS 345.31(2)(b)3.h.h. Certificates of compliance.
SPS 345.31 NoteNote: For further information relating to the welding documentation listed in subdivision 3. a. to d., see section IX of the ASME Boiler and Pressure Vessel Code, as referenced in section SPS 345.550 (1).
SPS 345.31(2)(b)4.4. Form SBD-5204 shall be completed and be retained at the job site for reference during inspections under this paragraph. If the design of the piping is acceptable, the authorized agent or the department shall sign the form.
SPS 345.31(2)(c)(c) Welded, prefabricated steel piping that is part of a mechanical refrigeration system to be erected on a job site shall be inspected at the fabrication shop by the authorized agent or the department – or, for out-of-state fabricators, by an inspector commissioned by the national board of boiler and pressure vessel inspectors. The fabricator shall make a copy of the inspection report or a copy of the completed form SBD-5204 available to the installer at the job site verifying that the prefabricated piping complies with ASME B31.5. Design calculations for the prefabricated piping shall be provided to the authorized agent or the department if so requested.
SPS 345.31(2)(d)(d) Within 5 business days of completing the installations and inspections under par. (b) or (c), a copy of the completed SBD-5204-E form shall be filed with the authorized agent or the department, unless additional time is granted by the authorized agent or the department.
SPS 345.31 NoteNote: The address for submitting forms to the Department is the Division of Industry Services, Mechanical Refrigeration Program, P.O. Box 7302, Madison, WI 53707-7302; and the fax number is 608-283-7420.
SPS 345.31 NoteNote: ASME B31.5 is a mandatory reference for designers, fabricators and producers of refrigeration equipment, and is referenced in appendix E of ANSI/ASHRAE standard 15, which is adopted in subchapter IV.
SPS 345.31 NoteNote: It is recommended that out-of-state installers contact the Department prior to any fabrication or installation of prefabricated piping, to expedite compliance with the Department’s requirements.
SPS 345.31 NoteNote: The National Board of Boiler and Pressure Vessel Inspectors can be contacted at 1055 Crupper Avenue, Columbus, OH 43229; or at telephone 614.888.8320; or at www.nationalboard.com.
SPS 345.31 NoteNote: The Department forms required in this chapter are available for a nominal fee at telephone 800-DOC-SALE or 411 (Telecommunications Relay) or at docsales@doa.state.wi.us, or at no charge at the Department’s Web site at www.dsps.wi.gov through links to Division of Industry Services forms.
SPS 345.31(3)(3)Periodic inspections.
SPS 345.31(3)(a)1.1. Except as provided in subd. 2., any mechanical refrigeration system using a Group A1 or B1 refrigerant and having a capacity rated at or greater than 50 horsepower, 50 tons or 50,000 volt-amperes shall be inspected by the authorized agent or the department at least once every 36 months.
SPS 345.31(3)(a)2.a.a. Mechanical refrigeration systems containing a Group A1 or B1 refrigerant which are used only for air conditioning for human occupancy and which have their mechanical components located outdoors with the discharge from any relief valve located at least 20 feet from any building opening are exempt from periodic inspections.
SPS 345.31(3)(a)2.b.b. An air intake opening that is part of an outdoor self-contained system under subd. 2. a. is not considered a building opening for the purposes of this subdivision.
SPS 345.31(3)(b)(b) Any mechanical refrigeration system using a Group A2, B2, A3 or B3 refrigerant and having a capacity rated at or greater than 10 horsepower, 10 tons or 10,000 volt-amperes shall be inspected by the authorized agent or the department at least once every 12 months.
SPS 345.31 NoteNote: See Table 1 and normative appendix C in ANSI/ASHRAE standard 15, as adopted in subchapter IV, for characteristics of the refrigerant groups listed in paragraphs (a) and (b).
SPS 345.31 HistoryHistory: CR 10-011: cr. (title), (1) and (2), sub. (3) renum. from Comm 45.08 (3) and am. Register August 2010 No. 656, eff. 9-1-10; correction in (2) (a) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; CR 11-047: cr. (2) (d) Register May 2012 No. 677, eff. 6-1-12.
SPS 345.32SPS 345.32Permit to operate.
SPS 345.32(1)(a)1.1. Within 5 business days after completing an inspection, the authorized agent or the department shall determine whether the mechanical refrigeration system complies with the applicable requirements of this chapter.
SPS 345.32(1)(a)2.2. For each inspection performed by an authorized agent, a report shall be sent to the department in accordance with the department’s electronic data interchange transfer guidelines, within 5 business days after completing the inspection, unless additional time is authorized by the department.
SPS 345.32 NoteNote: The Department will provide assistance at no charge regarding the use of the electronic data interchange system. The guidelines are available on the Internet at http://dsps.wi.gov/SB/docs/SB-BoilerEdiGuidelines.pdf.
SPS 345.32(1)(b)(b) Within 10 business days after making or receiving the determination under par. (a), the department shall issue a permit to operate if it has been determined that the mechanical refrigeration system complies with the applicable requirements of this chapter.
SPS 345.32(2)(2)The permit to operate shall list the maximum operating pressure allowed under this chapter.
SPS 345.32(3)(3)Permits to operate shall be valid for one of the following periods:
SPS 345.32(3)(a)(a) Three years, for systems inspected under s. SPS 345.31 (3) (a).
SPS 345.32(3)(b)(b) One year, for systems inspected under s. SPS 345.31 (3) (b).
SPS 345.32(4)(a)(a) The owner or user of a mechanical refrigeration system that is required to have periodic inspections under s. SPS 345.31 (3) shall be responsible for all of the following:
SPS 345.32(4)(a)1.1. Obtaining and maintaining a valid permit to operate each system.
SPS 345.32(4)(a)2.2. Notifying the authorized agent or the department, within 20 business days thereof, if the system is placed in an inactive status, as specified in sub. (5).
SPS 345.32(4)(b)1.a.a. The permit to operate shall be posted in the machinery room or adjacent to the entrance to the machinery room except as provided in subd. 1. b. and c.
SPS 345.32(4)(b)1.b.b. If there is no machinery room and the machinery is located within the building, the permit shall be posted in a conspicuous location on or near the machinery.
SPS 345.32(4)(b)1.c.c. If there is no machinery room and the machinery is located outside the building, the permit shall be posted in a conspicuous location near the access opening for the machinery unless otherwise approved by the authorized agent or the department.
SPS 345.32(4)(b)2.2. The posted permit shall be maintained in a legible state.
SPS 345.32(5)(a)(a) A mechanical refrigeration system may be placed in an inactive status if acceptable documentation is provided to the authorized agent or the department showing that the entire refrigerant charge has been removed from the system.
SPS 345.32(5)(b)(b) Within 5 business days after an authorized agent receives the documentation under par. (a), the agent shall verify the inactive status and report that verification to the department.
SPS 345.32 NoteNote: Shutdown of a system for repair, alteration, replacement or seasonal use is not considered to be placing it in an inactive status.
SPS 345.32(6)(6)The owner or user shall notify the authorized agent or the department at least 20 business days before reactivating a mechanical refrigeration system at any time after the expiration date on the permit to operate. The system shall be re-inspected by the authorized agent or the department and a new permit to operate shall be obtained before the system may be reactivated.
SPS 345.32 NoteNote: The Department can be notified by writing to the Division of Industry Services, Mechanical Refrigeration Program, P.O. Box 7302, Madison, WI 53707-7302; or by telephone at 608/266-7548 or 411 (Telecommunications Relay); or by using the contact information available through the following Web site: http://dsps.wi.gov/Documents/Industry%20Services/Maps/Mechanical-Refrigeration-Gas-Systems-Anhydrous-Ammonia%20Map%2008-13.pdf.
SPS 345.32 HistoryHistory: CR 03-012: cr. Register October 2003 No. 574, eff. 11-1-03; CR 10-011: (title) and (1) to (4) renum. from Comm 45.09 (title), (4), (1) to (3) and am., cr. (5), sub. (6) renum. from Comm 45.07 (4) and am. Register August 2010 No. 656, eff. 9-1-10; correction in (3) (a), (b), (4) (a) (intro.) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672.
SPS 345.33SPS 345.33Reporting of accidents. If a mechanical refrigeration system component fails and causes injuries to any person that require more than first aid treatment, the owner or user shall report the facts involved to the department within the following 24 hours. The owner or user may not remove or disturb the mechanical refrigeration system or any of its components nor permit any such removal or disturbance prior to receiving authorization from the authorized agent or the department, except for the purpose of saving human life or preventing property damage.
SPS 345.33 NoteNote: The address for reporting accidents to the Department is the Division of Industry Services, Mechanical Refrigeration Program, P.O. Box 7302, Madison, WI 53707-7302; and the fax number is 608-283-7420.
SPS 345.33 NoteNote: The Department can be contacted at 608-266-7548 during normal business hours. The State Division of Emergency Management can be contacted at 800-943-0003 during non-business hours.
SPS 345.33 HistoryHistory: CR 03-012: cr. Register October 2003 No. 574, eff. 11-1-03; CR 10-011: renum. from Comm 45.10 and am. Register August 2010 No. 656, eff. 9-1-10.
SPS 345.34SPS 345.34Petition for variance. The department shall consider and may grant a variance to a provision of this chapter in accordance with ch. SPS 303. The petition for variance shall include a position statement from the fire department having jurisdiction over the affected property, and from any authorized agent having jurisdiction.
SPS 345.34 NoteNote: Chapter SPS 303 requires the submittal of a petition for variance form (SBD-9890) and a fee, and that an equivalency is established in the petition for variance that meets the intent of the rule being petitioned. Chapter SPS 303 also requires the Department to process regular petitions within 30 business days and priority petitions within 10 business days.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.